Contact us

T +31 (0)85 00 21 810

Call me

References

Successful repair project Ship Motion Services

Sailing Yacht PURE PUUR, a 70ft Dutch built Nordia van Dam Performance Cruiser was brought to the STP Yard in Palma de Mallorca because of a technical situation the yacht experienced with their cpp propulsion system.

Within a short period of time the necessary parts where shipped and the Ship Motion Services Engineers travelled to Palma for the technical support on board. The repair was done over the weekend and the ship was launched on Monday. The day after SY PURE PUUR continued her voyage.

Survey 151ft Sailingyacht

For this 151ft Sailingyacht we did a RINA shaft survey.

At the same time our engineers checked the alignment of the total propulsion system.

Refit 80ft Sailingyacht

The refit of this 80ft Sailingyacht consisted of the replacement of the complete controle unit of the CPP.
This included modernization of the hydraulic system and the replacement of the electronics.

Next to this we did an alignment check.